LO2: Risk Assessment (P3)
During the production of my Ident we will need to ensure that risk assessments are carried out and have been identified. The risks that I have identified for my idents are mentioned below:
LO2: Risk Assessment (P3)
During the production of my Ident we will need to ensure that risk assessments are carried out and have been identified. The risks that I have identified for my idents are mentioned below:
Locations | Hazard | Risk Rating | Controls |
School | Actors may not be in as they could be unwell. | Low - This is a low risk because i could use other people as a backup | Make sure the people that you need are contacted to be in. |
School | Damaging school Equipment | High - This is a high risk because damaging equipment will cost a lot of money and will lead to not being able to use other equipment. | Make sure equipment is safely used and in a correct manner. |
School | Rooms may not be Unavailable | Medium - There is always an alternative to not having a room. | Ask another teacher for another room. |